Newly incorporated companies are less likely to apply for a new-build permit
Of the 31,192 companies with incorporation, 0.51% also had a new-build permit application within nine months, against 1.09% among similar companies. The source only covers 671,780 companies with their registered office in Flanders; the comparison stays within that group.
New-build permit application within nine months of the event
Both measurements combined · 31,192 companies
Less often than among similar companies.
- 95% interval
- 0.40× to 0.54×
- Companies
- 31,192
- Measurements
- 2, independent
Caveat Read the title as an association, not as a cause. The source covers only part of the companies. The absolute difference is small, even though the factor is high. The outcome may be spotted more often at companies with the event. Measured within one region only.
Does it hold up?
Each measurement uses different companies and a different period. A link only counts if it shows up in both.
| Measurement | Period | With the event | Similar | Factor |
|---|---|---|---|---|
| Measurement 1 | event Feb–Jun 2025, outcome Jul 2025–Mar 2026 | 0.58% | 1.02% | 0.56× |
| Measurement 2 | event Jul–Dec 2025, outcome Jan–Sep 2026 | 0.46% | 1.14% | 0.40× |
How often does this happen?
Belgian companies with the event, per month, over the last twelve complete months.
More on incorporation
9 other findings
Technical note
Methodology- Design
- Retrospective cohort study
- Population studied
- 671,780 companies with their registered office in Flanders
- Comparison group
- Companies without the event that had another publication or event in the same entry period (active group), from the same stratum: NACE section, size class and age class; indirect standardisation
- Cohorts
- event Feb–Jun 2025, outcome Jul 2025–Mar 2026; event Jul–Dec 2025, outcome Jan–Sep 2026
- Observed and expected
- 158 cases, 340 expected
- Factor (95% interval)
- 0.46× (0.40× to 0.54×)
- Multiple testing
- q < 0.001 (Benjamini-Hochberg)
- Second measurement
- p < 0.001
- Other comparison groups
- economically active companies 0.63× (0.54× to 0.74×); all companies 1.7× (1.5× to 2.0×)
- Absolute difference
- -0.6 percentage points
- Size of the groups
- active 67,044, economically active 214,185, all 671,780 companies
- Strata
- 88 strata of at least 300 companies (section × size × age; smaller strata merged)
- Review
- Tests passed: stability across measurements, excluding cases within 60 days, excluding the largest stratum, overlap of definitions, E-value, by stratum. Not passed: three comparison groups, placebo event.
- Data up to
- September 2026
Hunch Lab (2026). Newly incorporated companies are less likely to apply for a new-build permit. Data up to September 2026. https://hunchleads.com/en/lab/oprichting-vg-nieuwbouwAbout Hunch Lab
Hunch Lab is the research programme of Hunch. Every finding is free to reuse with attribution. Questions are welcome.
Share this finding
A shared link shows the card automatically. The image (1080 x 1350) is made for LinkedIn or Instagram.